Case Study
 
 
 
Case Study
11 E Lenox Multifamily Building in Boston, MA

11 E Lenox Multifamily Building in Boston, MA

?

CS-10_Ronald_McDonald-House_Case_Study_Inline_Callout1_690x345
 
 
 

Building Type: Multifamily, Mass Timber, Passive House (PHIUS) Certified

Solution: ArmorWall Plus Fire-Rated (FR) Structural Insulated Sheathing (SIS) as part of k8ÓéÀÖ? ArmorWall? Systems

Sales Representative: facades X

Architect: Monte French Design Studio

General Contractor: Haycon Inc.

Installer: ONTIME Construction

 
 
 

ArmorWall Systems

Blower Door Testing by Retrotec

 
 
 

Summary

Conceived in 2019 and scheduled for completion in late 2022, 11 E Lenox is the first ground up Mass Timber project in the City of Boston. Mass Timber was selected to achieve sustainability goals that include lowering the project¡¯s embodied carbon compared to traditional materials, such as concrete and steel. But, the project team didn¡¯t stop there. 11 E Lenox is pre-certified and expects to meet PHIUS+ 2018 standards, which require advanced energy efficiency measures that benefit the building owner and occupants through passive design and high-performance construction methods. ArmorWall Plus FR SIS was specified for the project to realize the 5-in-1 system¡¯s many benefits that include labor and schedule savings, air, water, and fire resistance, and structural support.

 
 
 
 
 
 